So Wednesday, they re-drew the building placement and started to dig the foundation out and poured in the base concrete (as seen below):


Next, we had a ton of blocks delivered and added 2 extra storage rooms and a utility room on the back of the building. This caused them to have to re-do the foundation. Again, my fault because I was not satisfied with how it looked so far.

Today, they are setting up the wall bases. The tops of the block pictured are how high the floor is going to be. You can see the difference above the current ground elevation. Thus, we have over 20 semi loads of rock being delivered Monday morning.
Sorry for the image heavy update. Just a bit excited that things have finally started.
Slowbek